Quick answer

Ready-to-move flats cost more upfront but carry no GST and no possession delay, and you can inspect the actual home. Under-construction flats usually cost less, offer staged payments and newer amenities, but attract GST (1 or 5 percent on the construction portion) and expose you to delay risk, although RERA gives buyers remedies. If you need a home soon or want certainty, choose ready-to-move; if you have time and a trusted RERA-registered developer, under construction can save money.

Key takeaways

  • Ready flats with an occupancy certificate carry no GST; under-construction flats attract 1 or 5 percent GST.
  • Under-construction homes often have lower prices and staged payments, but you may pay rent and EMI at the same time.
  • RERA gives under-construction buyers rights on delays and defects, but you still need to verify the project.
  • Always see the occupancy certificate for a ready flat and the commencement certificate for an under-construction one.
  • Match your choice to your timeline, not just to price.

Side-by-side comparison

FactorUnder constructionReady-to-move (with OC)
PriceUsually lower per sq ftUsually higher per sq ft
GST1% (affordable) or 5% (others), on the construction portionNone
Stamp duty and registrationPayable on registering the agreementPayable on registering the sale
PaymentStaged, linked to constructionMostly upfront; loan disbursed in full
PossessionWait for the RERA completion dateImmediate or near-immediate
InspectionSample flat and plans onlyYou can inspect the actual home
Cost of waitingRent plus pre-EMI during constructionMoving in or renting out quickly
Choice of unitWide selection of floors and layoutsLimited to what is unsold
Key documentsCommencement certificate, RERA registration, approvalsOccupancy certificate, society details, maintenance dues
Main riskDelay, quality or developer stressHidden defects, higher price

GST and total cost

GST is the clearest cost difference. Under-construction flats carry GST at 5 percent (non-affordable) or 1 percent (affordable housing up to ₹45 lakh and 60 sq m carpet area in metropolitan areas), charged on the construction portion after a land deduction. Ready flats with an occupancy certificate carry none. On an ₹80 lakh flat the GST can be around ₹2.7 lakh, which can offset part of the lower sticker price of the under-construction option. See our guide to hidden charges for a worked example.

Possession and delay risk

Delays are the biggest worry with under-construction flats. RERA offers real protections, but they only help if you check the project first.

  • Registration: projects above RERA thresholds must be registered. Check on MahaRERA using our step-by-step guide.
  • Escrow: promoters must deposit a large share of buyer payments in a designated account for construction costs.
  • Delay remedies: if a promoter fails to deliver on time, the buyer can generally choose between interest on the amount paid for every month of delay and a refund with interest, subject to the Act and the agreement.
  • Defects: structural and workmanship defects reported within five years of possession are the developer’s responsibility to fix.
  • Agreement: the possession date, payment schedule and delay terms should appear in the agreement for sale.
Contemporary white apartment facade with balconies and windows
Illustrative stock photo

The cost of waiting

While you wait for an under-construction flat, you may pay rent and loan interest at the same time. Banks often release the loan in stages, so your interest starts on the amount disbursed. A ready flat avoids that overlap. If you plan to move into the home, factor the waiting cost into your comparison. Tax treatment of pre-possession interest is different from interest after possession, and benefits are subject to limits, so ask a chartered accountant.

What to verify in a ready-to-move flat

  1. Occupancy certificate for the building or wing you are buying. A partial OC may not cover your flat.
  2. Society formation status and maintenance dues, including who holds the corpus fund.
  3. A written list of defects or snags and a promise to fix them before payment.
  4. Title documents, with a lawyer’s review, for resale flats.
  5. Utility readiness: water source, electricity connection and power backup.
  6. Actual condition: seepage, plumbing, wiring and lift operation.

Payment plans and subvention schemes

Some developers offer plans where payments are linked to construction milestones, which suits staged cash flow. Others advertise schemes where the developer pays the pre-EMI for a period. Such schemes have caused disputes in some markets, so read the terms carefully: who pays, for how long, what happens on delay and whether the cost is built into the price. Never rely on verbal promises.

Which should you choose?

  • Choose ready-to-move if you need to move in within months, dislike uncertainty or want to avoid GST.
  • Choose under construction if you have two to four years, want a lower price and newer amenities and can verify the developer.
  • Consider a mix: a nearly complete project can offer lower prices than a ready one with less delay risk, though you should still check the OC timeline.

For help setting the budget, see our first-time buyer’s guide and compare shortlisted projects using our project comparison guide.

Questions to ask the developer

  • What is the RERA completion date, and has it been extended before?
  • How much of the project has been completed, and can I visit the site?
  • What are the total charges beyond the agreement value?
  • Which bank has financed the project, and which banks have approved loans for it?
  • What is the delay interest clause in the agreement?
  • For a ready flat: is the OC for the entire building or only part of it?

Which choice fits which situation

SituationUsually fits betterReason
Renting now, lease ending in six monthsReady-to-moveAvoids paying rent and EMI together
Saving for a down payment over two yearsUnder constructionStaged payments give time to build funds
Buying for rental incomeReady-to-moveRental income can start immediately
Buying for long-term family use, no rushEitherPick on developer reliability and total cost

Neither choice removes the need for a legal check. Use our 10-point checklist before you book.

Frequently Asked Questions

Is it better to buy an under-construction or ready-to-move flat in Navi Mumbai?

Neither is always better. Ready flats offer certainty and no GST but cost more upfront. Under-construction flats cost less and offer staged payments but involve waiting and delay risk. Choose by your timeline and risk comfort.

Is GST applicable on ready-to-move flats?

No. A flat that has received its occupancy certificate before sale carries no GST. Resale flats also carry none.

What is an occupancy certificate and why does it matter?

An occupancy certificate (OC) is issued by the local planning authority after construction is completed in line with approved plans. It signals that the building is fit for occupation. Many lenders, utilities and later buyers expect it.

Can I get a home loan for an under-construction flat?

Yes. Lenders usually release money in stages linked to construction progress, and they check the project’s approvals and RERA registration first.

What can I do if the builder delays possession?

Under RERA you can generally choose between interest for each month of delay and withdrawing with a refund and interest, subject to the Act and the agreement. You can also file a complaint with MahaRERA. Keep all payment records and correspondence.

Is a ready-to-move flat safer in Navi Mumbai?

It removes delay risk and lets you inspect the home, but you still need to verify title, the occupancy certificate and the condition of the building.

Deciding between ready and under construction?

Share your timeline and budget, and we will compare ready and under-construction options with their full costs.

Call +91 91364 74207WhatsApp Us

This article is general information, not legal, tax or financial advice. Prices, rules and project details change, so verify RERA registration and confirm figures with the developer, your lender or a qualified professional before you commit. Price ranges are indicative and dated. Read our disclaimer.